Contractor-facing
Concrete estimating for general contractors and subcontractors on hard-bid work
We turn structural drawings and concrete plans into bid-ready concrete cost estimates - volume, formwork, and rebar quantified for foundations, slabs, and structural concrete alike.
Estimate Ticket
Sample layout · figures populated per project
Scope
Concrete quantity takeoff
Volume
- cu yd
Formwork area
- sf
Reinforcing steel
- tons
Mix design
Per spec
Turnaround
24–72h
Service Overview
Concrete estimating for general contractors and subcontractors on hard-bid work
Concrete estimating for concrete contractors, scoped to real pour sequences
Cast-in-place, precast, post-tension, and tilt-up concrete estimating in one shop
Outsourced concrete estimating services that flex up during bid season
Services
Order a single takeoff or the full concrete cost estimate - volume through placement.
LOT 01
Complete concrete quantity takeoff - concrete volume calculation and concrete cubic yard takeoff - pulled directly from structural drawings, foundation plans, and slab plans.
LOT 02
Material, labor, and equipment combined into a single concrete cost estimate, priced against current ready-mix and reinforcing steel costs.
LOT 03
Formwork takeoff services covering formwork area by wall, column, and slab type - reusable versus single-use formwork noted separately.
LOT 04
Reinforcing steel takeoff and wire mesh quantity takeoff, itemized by bar size and placement, tied to concrete reinforcement estimating standards.
LOT 05
Structural concrete estimating for columns, beams, grade beams, and elevated slabs on cast-in-place or post-tension systems.
LOT 06
Foundation, slab-on-grade, retaining wall, and site concrete estimating for new construction and renovation scope.
Process
The same five-stage sequence behind every concrete cost estimate we deliver, sized to project scale.
POUR 01
Structural drawings, concrete plans, slab plans, and concrete sections and details reviewed for concrete specifications and mix requirements.
POUR 02
Concrete quantity takeoff by element - footings, slabs, walls, columns, beams - measured in cubic yards.
POUR 03
Formwork area and reinforcing steel quantified together, with anchor bolt and vapor barrier takeoff where specified.
POUR 04
Material, labor, equipment, placement and finishing, and pumping and curing costs priced against a stated waste allowance.
POUR 05
Quantities checked against marked-up plans before you receive a bid-ready concrete estimate with assumptions and exclusions.
Project types
Concrete volume and reinforcement scope shift by project type - our takeoffs account for that from the first pass.
What's included
No stripped-down lump sum - you get the backup that lets you defend the number.
Cubic yards by element, tied to the specified concrete mix design.
Recent estimate types
Representative snapshots showing the range of concrete takeoffs we handle. Figures shown are illustrative.
Foundation / Res
Footing concrete takeoff and slab-on-grade takeoff for a residential new-construction project.
Material + formwork
High-rise / Com
Elevated slab takeoff with post-tension concrete estimating across multiple floors, tied to structural sections and details.
Volume + rebar
Parking garage / Civ
Precast concrete estimating for columns, beams, and pile cap concrete takeoff on a multi-level parking structure.
Bid-ready estimate
Why us
Fast-turnaround concrete estimates without shortening the takeoff - most jobs move in 24–72 hours.
Formwork estimating and rebar estimating services delivered together, so quantities stay consistent across trades.
Material, formwork, reinforcement, labor, and equipment separated line by line, not bundled into one number.
Every concrete quantity takeoff is checked against marked-up plans before it reaches your desk.
Outsource concrete estimating for one project or your entire pipeline during peak bid season.
Every estimate states procurement planning notes and assumptions and exclusions up front - no surprises at award.
Who we help
Ready to Bid?
Send your structural drawings and get back a professional concrete estimating services package - volume, formwork, and rebar, priced and ready to bid.
Yes. Concrete quantity takeoff from PDF plans is our most common intake format, alongside CAD files and scanned structural drawings.
Most projects turn around in 24–72 hours depending on volume and reinforcement complexity. Larger projects are quoted with a set delivery date up front.