Sitework Estimating Services for Contractors Who Need Numbers They Can Bid On

Estimating Buddies delivers sitework estimating services covering earthwork, grading, underground utilities, drainage, paving and landscaping - built from your civil drawings into a bid-ready cost estimate with quantities, labor, equipment and material pricing your team can defend at the bid table.

Site Plan

Sample layout · figures populated per project

Bid Ready

Scope

Sitework quantity takeoff

Earthwork

- cy

Utilities

Per plans

Paving

Per spec

Turnaround

24-72h

As fast as 24-72 hrs

Turnaround

USA & Canada

Coverage

Excel, PDF & marked-up plans

Format

Any scope, any division

Project size

On this page

Sitework Service Overview

Sitework estimating, built the way your bid actually reads

A sitework estimate has to hold up across trades - earthwork, utilities, paving and landscaping all draw from the same drawing set but price out differently. Our site work estimating services break the project into the same scope order a superintendent would walk the job in, so quantities, assumptions and pricing line up with how the work actually gets built and billed.

Whether you're bidding a subdivision, a retail pad site, an industrial yard or a municipal roadway package, we work from your civil drawings, specifications and geotechnical reports to produce a sitework cost estimate that your estimating team can hand off to procurement, or that a solo estimator can use to submit a competitive bid without redoing the math. Flatwork on the same site can also use concrete estimating services.

What a sitework estimate needs to answer

01

How much material moves - cut, fill, import, export and haul distance.

02

What goes underground - pipe, structures, bedding and trench backfill by utility type.

03

What covers the surface - paving sections, curb, sidewalk and site concrete.

04

What finishes the site - drainage structures, erosion control and landscaping.

05

What it costs to build - labor hours, equipment time and subcontractor scope.

Scope Coverage

What our sitework estimator covers, division by division

Every sitework quantity takeoff we produce is organized by scope so it can be priced, reviewed and handed to subcontractors without reformatting.

Site Clearing & Demolition

Tree and brush clearing, grubbing, pavement removal, structure demolition and debris haul-off, quantified for disposal planning.

  • Clearing & grubbing acreage
  • Pavement and concrete removal
  • Structure demolition volumes

Excavation, Cut & Fill

Earthwork quantities from surface-to-surface comparison, including cut, fill, import/export balance and topsoil handling.

  • Cut and fill volumes (CY)
  • Import/export balance
  • Topsoil strip and respread

Grading & Soil Preparation

Rough and finish grading quantities, subgrade preparation and soil compaction requirements tied to geotechnical recommendations.

  • Rough & finish grading area
  • Subgrade prep & proof-roll
  • Compaction & moisture control

Erosion & Sediment Control

Silt fence, inlet protection, erosion control blankets and construction entrances sized to the SWPPP or permit set.

  • Silt fence & inlet protection
  • Erosion control blanket area
  • Construction entrance pads

Stormwater & Drainage

Storm sewer pipe, structures, detention/retention basins and drainage swales measured off grading and utility plans.

  • Storm pipe by size & length
  • Catch basins & manholes
  • Detention/retention volume

Underground Utilities

Water, sanitary sewer, gas and electrical duct bank quantities including trench length, bedding and structure counts.

  • Water & sanitary main footage
  • Gas & electrical duct bank
  • Structures & appurtenances

Trenching, Bedding & Backfill

Trench excavation, pipe bedding material, backfill and compaction quantities calculated by utility depth and pipe class.

  • Trench volume by depth
  • Bedding & select backfill
  • Compaction lift counts

Paving & Concrete Sitework

Asphalt paving sections, concrete paving, curb and gutter, sidewalks and pavement markings measured by area and linear footage.

  • Asphalt & concrete paving area
  • Curb, gutter & sidewalk footage
  • Striping & signage counts

Retaining Walls & Site Concrete

Segmental and cast-in-place retaining walls, dumpster pads, equipment pads and other exterior concrete flatwork.

  • Wall face area & height ranges
  • Reinforcement & drainage backfill
  • Pad & flatwork square footage

Landscaping & Exterior Improvements

Seeding, sod, planting, irrigation, fencing and site furnishings quantified from landscape plans for final site stabilization.

  • Seed/sod & planting counts
  • Irrigation zones & heads
  • Fencing & site amenities

Hauling, Equipment & Labor

Material hauling and disposal allowances, equipment hours by task and labor crews sized to the schedule and site access.

  • Haul distance & trip counts
  • Equipment hours by operation
  • Crew sizing & labor hours

Subcontractor Scope Packages

Scope-specific quantity packages formatted for utility, paving and landscaping subcontractors to price independently.

  • Trade-split scope sheets
  • Inclusion/exclusion notes
  • Ready for sub-bid leveling

Who We Serve

Built for the people who bid, build and manage sitework

Our sitework estimator supports every role that touches the civil scope of a project, from the first bid invitation through subcontractor buyout.

General Contractors

Excavation Contractors

Civil Contractors

Site Developers

Utility Contractors

Paving Contractors

Landscaping Contractors

Architects

Civil & Structural Engineers

Home Builders

Property Developers

Public Agencies & Municipalities

Project Types

Site development estimating across every project category

From subdivision grading to municipal roadway packages, the takeoff is organized around the civil scope actually shown on your drawings.

Residential

Single-family lots, subdivisions and multifamily communities, from rough grading through final utility connections.

Commercial

Retail pads, office parks, hotels and restaurants where parking, drainage and utility tie-ins drive the sitework budget.

Industrial

Warehouses, distribution centers and manufacturing sites with heavy paving sections and large-scale earthwork.

Municipal & Public Works

Roadway, utility replacement and public facility projects estimated to municipal specifications and unit-price bid formats.

Institutional

Schools, healthcare campuses and government facilities with phased sitework tied to occupancy and safety requirements.

Civil & Infrastructure

Roadway corridors, utility infrastructure and heavy civil scopes requiring detailed earthwork and drainage takeoffs.

What's Included

Everything that goes into a complete sitework estimate

Every sitework cost estimating engagement is scoped to your project, but a typical estimate covers the following.

01

Trade-wise quantity takeoff for every division of sitework

02

Cut-and-fill volume calculation from grading plans

03

Material quantities for aggregate, pipe, concrete and asphalt

04

Labor hours and crew sizing by scope of work

05

Equipment hours and rental or ownership cost allowances

06

Hauling and disposal allowances based on haul distance

07

Local material and labor pricing where available

08

Subcontractor scope packages for utility and paving trades

09

Marked-up civil drawings showing takeoff areas

10

Bid summary organized by CSI division or your preferred format

11

Documented assumptions, exclusions and clarification notes

12

Revision support for addenda and plan changes

Deliverables

What lands in your inbox

Every sitework estimating engagement ends with a documented package, not just a total.

Quantity Takeoff Report

Trade-wise sitework quantity takeoff with units, formulas and reference sheet numbers.

Cost Estimate Spreadsheet

Editable Excel workbook with material, labor, equipment and subcontractor line items.

Marked-Up Drawings

Color-coded PDF takeoff sheets showing exactly where each quantity was measured.

Bid Summary

A one-page rollup by CSI division ready to attach to your proposal or bid form.

Assumptions & Exclusions

Written notes covering what's included, what's excluded and any clarifications for the GC.

Hauling & Disposal Allowance

Trip counts and disposal cost allowances based on stated or assumed haul distances.

Subcontractor Scope Sheets

Trade-split quantity packages formatted for utility, paving and landscaping sub-bids.

Revision Log

A tracked record of changes made across addenda so nothing gets double-counted or missed.

Sample Sitework Estimate

What a typical scope summary looks like

A simplified excerpt from a commercial pad-site sitework estimate, shown for illustration. Actual quantities, units and pricing vary by project - figures below are placeholders, not a quote.

Sample Project - 3.2-Acre Commercial Pad Site

Illustrative only

Not a quote

Clearing & grubbing

3.2

AC

Includes tree removal per plan

Cut / fill (net export)

2,450 / 1,180

CY

Export balance ~1,270 CY

Storm sewer pipe (15"-24")

640

LF

RCP, per grading & utility plan

Sanitary sewer main

310

LF

PVC SDR-35, avg. 8 ft depth

Water main & services

420

LF

Includes fire line tie-in

Asphalt paving (parking & drive)

38,500

SF

3" surface / 6" base per detail

Concrete curb & gutter

1,180

LF

Standard 6" curb, per detail

Sidewalk & ADA ramps

2,900

SF

Includes 4 accessible ramps

Erosion control (silt fence)

960

LF

Per SWPPP layout

Seeding & landscaping

1.4

AC

Disturbed area restoration

This excerpt represents one section of a full sitework estimate. A complete deliverable also includes labor hours, equipment allowances, hauling costs, subcontractor pricing and a written assumptions log.

Our Process

How a sitework estimate comes together

The same six-step process behind every sitework cost estimate we deliver, from drawing intake through a bid-ready package.

01

Submit your drawings

Upload civil drawings, grading plans, utility plans, specifications and any geotechnical reports through our secure intake, along with your bid date and turnaround needs.

02

Scope review

Our team reviews the drawing set for completeness, notes any missing details or conflicting information, and confirms the scope of the estimate with you before takeoff begins.

03

Digital quantity takeoff

Quantities are measured directly from the digital drawings - earthwork surfaces, utility runs, paving areas and landscape zones - using on-screen takeoff and civil design software.

04

Cost application

Material, labor and equipment costs are applied using current local pricing, published cost data and, where provided, your own historical unit costs.

05

Internal quality review

A second estimator cross-checks quantities against the drawings, verifies formulas and confirms the estimate is complete before it's finalized.

06

Delivery & walkthrough

You receive the estimate, marked-up drawings and bid summary, plus a call or written walkthrough of assumptions, exclusions and anything that needs your input.

Software & Pricing Sources

Tools and data behind every sitework takeoff

We measure quantities digitally and apply pricing from a mix of published data and current market sources so figures reflect real conditions, not generic averages.

Takeoff Software

PlanSwift, Bluebeam Revu and On-Screen Takeoff for digital quantity measurement

Civil Design Tools

AutoCAD Civil 3D and Trimble Business Center for surface and earthwork analysis

Published Cost Data

RSMeans cost data as a pricing reference, adjusted for local conditions

Market Pricing

Local supplier and vendor quotations for aggregate, pipe, concrete and asphalt

Estimate Format

Excel-based cost breakdowns that stay fully editable after delivery

Terrain Analysis

Digital terrain modeling for cut-and-fill and earthwork volume calculations

Document Review

Cross-referencing civil drawings, specifications and geotechnical reports

File Compatibility

PDF, DWG and IFC drawing formats accepted for takeoff

Accuracy & Quality Assurance

How we keep estimates dependable, not just fast

Every sitework estimate is reviewed against the drawings, specifications and geotechnical data before it leaves our desk.

01

Second-estimator review

Every estimate is checked by a second estimator before delivery to catch missed scope, formula errors or misread drawings.

02

Drawing and spec cross-check

Quantities are verified against both the drawings and the written specifications so scope isn't taken from one source alone.

03

Documented assumptions

Anywhere a drawing is unclear or incomplete, we log the assumption in writing rather than guessing silently.

04

Addendum tracking

When plans are revised, we track what changed and update only the affected quantities to avoid double-counting.

05

Current local pricing

Material and labor rates are checked against current regional data rather than reused from older estimates.

06

Post-delivery support

If a question comes up while you're finalizing your bid, you can reach the estimator who built the takeoff directly.

Why Estimating Buddies

A sitework estimating company built around your bid deadline

Sitework estimating is a specialized civil scope. These are the reasons contractors hand that number to a sitework-focused team instead of folding it into a general takeoff.

Scope-specific expertise

We estimate sitework exclusively across earthwork, utilities, paving and landscaping - not as one line item inside a general building estimate.

Turnaround that fits your bid date

Standard and expedited turnaround options so a tight bid schedule doesn't force you to skip a proper takeoff.

Estimates you can defend

Every quantity traces back to a marked-up drawing and a documented assumption, so you can answer questions at the bid table.

Works with your existing process

Deliverables arrive in editable formats that plug into your existing bid forms, spreadsheets and subcontractor workflows.

Coverage across the USA and Canada

Familiarity with regional pricing variation and common specification formats used across both countries.

Direct access to your estimator

Questions go to the person who built the estimate, not a general support queue.

Pricing Factors

What actually moves the cost of an estimate - and the project

Sitework costs vary widely by project, and no two sites price out the same way. These are the factors that most often shift a sitework cost estimate.

Project Size

Larger sites generally lower the per-unit cost of mobilization but increase total earthwork and utility footage.

Site Conditions

Existing slopes, vegetation, obstructions and access constraints affect clearing and equipment productivity.

Soil & Geotechnical Reports

Soil type, groundwater and bearing capacity influence compaction requirements, dewatering and import/export volumes.

Grading Complexity

Tight cut-and-fill balances, retaining structures and steep grade changes add labor and equipment time.

Utility Depth & Routing

Deeper trenches, rock excavation and utility conflicts increase trenching, shoring and dewatering costs.

Material Prices

Aggregate, pipe, concrete and asphalt pricing fluctuate by region, supplier and market conditions.

Labor Rates

Prevailing wage requirements and local labor market conditions vary significantly by state, province and project type.

Equipment Requirements

Specialized equipment for rock excavation, dewatering or shoring adds mobilization and rental costs.

Hauling Distances

Distance to disposal sites or import material sources directly affects trucking and disposal allowances.

Drawing Completeness

Incomplete or preliminary drawings require more assumptions, which widens the estimate's margin for change.

Turnaround Required

Expedited timelines may limit the depth of quantity verification possible before your bid deadline.

Permit & Jurisdiction Requirements

Local stormwater, erosion control and inspection requirements can add scope not shown directly on the drawings.

Ready to Bid?

Get a bid-ready sitework estimate

Upload your site plans and get a bid-ready sitework cost estimate - earthwork, utilities, paving and landscaping, checked before it reaches your bid.

  • Earthwork, utilities, paving and landscaping quantified together
  • As fast as 24-72 hour turnaround on typical projects
  • Excel, PDF and marked-up plans in every package
  • Assumptions and exclusions documented in every estimate

Frequently Asked Questions

Sitework estimating services, answered directly

Sitework estimating services measure and price the civil work required to prepare a site for construction - earthwork, grading, underground utilities, drainage, paving, and landscaping - so contractors can submit a bid-ready sitework cost estimate built from civil drawings. Related scope on the same drawings can move through our MEP estimating services.

A typical sitework estimate includes trade-wise quantity takeoff, cut-and-fill volumes, material quantities for aggregate, pipe, concrete and asphalt, labor hours and crew sizing, equipment hours, hauling and disposal allowances, marked-up civil drawings, a bid summary, and documented assumptions and exclusions. Matching trade quantities are covered by our rebar estimating services.