Construction estimating · Illinois

Construction Estimating Services in Illinois

Cost estimating and quantity takeoff for residential, commercial, industrial, and public projects - priced against Chicago-area and downstate Illinois labor and material markets, trade by trade or as a full bid package.

Estimate summary

Grid ref C–4

Sample

Concrete & structural steel

Cast-in-place footings, 4,000 PSI

620 CY

Structural steel framing, W-shapes

118 TN

Metal deck, composite floor

42,000 SF

Slab-on-grade, reinforced

28,400 SF

Est. structural subtotal

$2,184,600

2–10 days

typical turnaround

15+ trades

estimated by division

102 counties

Illinois covered

Why Estimating Buddies

Estimators who know Illinois isn't one construction market

Chicago's union agreements, prevailing wage rates, and Department of Buildings amendments run very differently from a project in Rockford, Peoria, or Springfield. We price every Illinois estimate against the labor and material conditions of the project's actual jurisdiction, not a single statewide average.

Chicago and downstate both covered

We track Chicago's union scale and Department of Buildings amendments alongside downstate open-shop labor markets, so the same estimate template doesn't get forced onto two very different cost environments.

Prevailing wage handled correctly

When a project falls under the Illinois Prevailing Wage Act, labor is priced using the Illinois Department of Labor's county rate schedule instead of standard market rates, avoiding a bid that's priced wrong from the start.

Full division coverage, one point of contact

Fifteen-plus trade divisions are estimated by specialists in that trade, then assembled into one coordinated deliverable, so quantities don't double up or fall through the gaps between scopes.

Core services · Column grid A

Estimating services built around your bid, not ours

Order a single service or bundle several - each is delivered as its own clear line item so you know exactly what you're paying for.

Grid A–1

Construction cost estimating Illinois

Full project cost estimates with labor, material, equipment, and markup broken out separately by division.

Grid A–2

Quantity takeoff Illinois

Measured quantities of concrete, steel, framing, finishes, and every other material directly from your drawings.

Grid A–3

Material takeoff Illinois

Purchase-ready material lists by size, type, and quantity, formatted for ordering or supplier quote requests.

Grid A–4

Bid preparation Illinois

Scope letters, exclusion lists, and subcontractor quote leveling so you walk into bid day with a complete package.

Grid A–5

Preconstruction & conceptual estimating Illinois

Budget-level estimates from schematic or design-development drawings, before construction documents are final.

Grid A–6

Change order & value engineering Illinois

Priced change orders and RFIs using the original estimate's unit costs, plus cost-reduction alternatives when asked.

Grid A–7

Labor cost estimating Illinois

Labor hours priced against Chicago union scale or downstate open-shop rates, matched to the project's actual jurisdiction.

Grid A–8

Trade-by-trade estimating Illinois

Any single division estimated on its own for a subcontractor bidding one scope of a larger project.

Project types

From a single-family remodel to a Loop high-rise

Illinois demand runs from suburban subdivisions and downstate agricultural-belt projects to Chicago high-rise, adaptive reuse, and the state's growing industrial and data center pipeline.

01

Single-family & custom homes

02

Multifamily & apartment communities

03

Commercial & retail

04

Office & tenant improvement

05

Industrial & distribution centers

06

Data centers

07

Healthcare

08

K–12 & higher education

09

High-rise & mixed-use

10

Adaptive reuse

11

Government & public works

Trade-by-trade breakdown

Every division, estimated on its own

Each trade below can be ordered alone or combined into a full multi-trade estimate, referenced by its standard CSI MasterFormat division number.

CSITrade
03 30 00Concrete
04 20 00Masonry
05 12 00Structural steel
06 10 00Rough carpentry & framing
07 30 00Roofing
08 10 00Doors, windows & glazing
09 20 00Drywall & plaster
09 60 00Flooring
09 90 00Painting & finishes
21 00 00Fire suppression
22 00 00Plumbing
23 00 00HVAC & mechanical
26 00 00Electrical
31 00 00Earthwork & excavation
32 00 00Site paving & landscaping
33 00 00Site utilities

Who we serve

Built for both sides of the bid table

General contractors use our estimates to assemble a full bid or check subcontractor pricing before award. Subcontractors use the same trade-specific numbers directly to price and submit their own bids.

General contractors

Trade subcontractors

Developers

Architects & engineers

Public agencies

Construction lenders

Illinois notes

What we track for Illinois projects

Illinois construction cost varies more by jurisdiction and labor agreement than almost any factor in the drawings themselves.

Illinois Prevailing Wage Act

Public and publicly funded projects must pay county-specific prevailing wage rates set by the Illinois Department of Labor, which we apply whenever a project is subject to the Act.

Chicago vs. downstate labor markets

Chicago's union building trades operate under a different wage and productivity structure than the largely open-shop labor markets found in much of downstate Illinois, which changes labor cost per unit significantly.

City of Chicago Building Code

Chicago enforces its own building code with local amendments distinct from the base International Building Code used in most other Illinois jurisdictions, affecting structural, fire, and life-safety quantities.

Illinois Capital Development Board

State-funded projects, including many school and public facility jobs, follow Capital Development Board cost standards and procurement requirements that we factor into public-sector estimates.

Local zoning & permitting

Collar-county municipalities and downstate jurisdictions each set their own permit fees and site development requirements, which we confirm before finalizing sitework and utility quantities.

Accessibility (ADA)

Fixture clearances, accessible unit counts, and path-of-travel requirements are verified against ADA and Illinois accessibility code for public and commercial projects.

Our process

From drawings to a bid-ready estimate

Six steps, whether you need one trade priced or a complete multi-division bid package.

Step 01

Send your drawings

Upload PDF or CAD construction documents and your bid due date.

Step 02

Scope confirmation

We confirm which divisions to estimate, the project's jurisdiction, and any inclusions or exclusions.

Step 03

Digital takeoff

Quantities are measured in Bluebeam, PlanSwift, or On-Screen Takeoff directly against your drawings.

Step 04

Cost application

Labor and material pricing is applied using current Illinois market data, or prevailing wage rates where required.

Step 05

Internal QA review

A second estimator checks quantities against the drawings before anything is delivered.

Step 06

Delivery & revisions

You receive the full spreadsheet and summary, with free revisions if drawings change before you bid.

Deliverables

What's included in every estimate

Every deliverable is built to stand on its own, whether it's feeding a full GC bid or a single subcontractor's proposal.

Sample estimate

What an estimate looks like

A shortened excerpt from a recent 6-story mixed-use building estimate in Chicago's West Loop - the full deliverable breaks out every division separately.

6-story mixed-use · Chicago West Loop

Shortened excerpt

Sample
Scope itemQuantityUnit costExtended cost
Structural steel framing & metal deck210 TN$4,150$871,500
Cast-in-place concrete, foundations & slabs1,480 CY$385$569,800
Exterior masonry & terra cotta-style cladding22,600 SF$46$1,039,600
Interior drywall & framing, 128 units184,000 SF$5.20$956,800
MEP rough-in, all systems128 units$8,400$1,075,200
Site utilities & paving1 LS-$412,000
Estimated construction subtotal (excludes overhead & profit)$4,924,900

Software & pricing sources

Tools we take off and price with

We work in the takeoff and pricing tools most Illinois contractors already use, so our output drops straight into your workflow.

Takeoff & estimating software

  • Bluebeam Revu
  • PlanSwift
  • On-Screen Takeoff
  • Trimble WinEst

Pricing sources

  • RSMeans cost data
  • Client historical pricing

Service areas

Serving contractors across Illinois

We estimate projects statewide, with the deepest project history across Chicago and the collar counties.

Chicagoland

Cook, DuPage, Lake, Will, Kane, McHenry

ChicagoCook CountyAuroraKane / DuPageNapervilleDuPage / WillJolietWill CountyElginKane CountyWaukeganLake CountySchaumburgCook CountyEvanstonCook County

Central Illinois

Sangamon, Peoria, McLean, Champaign

SpringfieldSangamon CountyPeoriaPeoria CountyBloomingtonMcLean CountyChampaignChampaign County

Rockford

Winnebago County

RockfordWinnebago County

Southern Illinois

Madison, St. Clair & downstate counties

Pricing factors

What moves a construction estimate

FactorHow it affects the estimate
01Project size & complexityMore square footage, more building types, and more trades all add estimating time and line items.
02Drawing completenessFull construction documents take off faster than schematic drawings that require assumptions.
03Labor market & wage requirementsChicago union scale, downstate open-shop rates, and Illinois prevailing wage each price a project differently.
04Turnaround neededStandard 2–10 business day timelines cost less than a same-week bid-day rush.

Accuracy & QA

How we keep estimates accurate

Every estimate goes through an independent second review before delivery, and every quantity is traceable back to a specific sheet on your drawings.

From Illinois contractors

What clients say

“We sent them a full drawing set for a Naperville office build-out with a five-day turnaround, and the takeoff matched our own supplier quotes closely enough that we bid with real confidence.”

Preconstruction manager, DuPage County general contractor

“They priced our prevailing wage labor correctly for a Cook County school project on the first pass. That alone saved us a rebid.”

Estimator, Chicago-area electrical subcontractor

“Labor and material are broken out separately, so I can apply my own crew rates instead of reworking someone else's assumptions.”

Owner, downstate Illinois framing contractor

Send us a set of plans

Request an Estimate

Upload PDF or CAD construction documents and your bid due date. We confirm divisions, jurisdiction, and exclusions before pricing starts.

  • Line-item quantity takeoff by division and material
  • Labor hours separated from material cost
  • Prevailing wage labor pricing where applicable
  • Free revisions if drawings change before you bid

Frequently asked questions

Common questions about Illinois construction estimating

A quantity takeoff measures how much of each material a project needs, counted directly from the drawings: linear feet of framing, square feet of drywall, cubic yards of concrete. A construction estimate applies labor hours, unit prices, equipment, and markup to those quantities to produce a dollar figure. We provide both, and most Illinois clients order them together as one deliverable. Matching trade quantities are covered by our drywall estimating services.

Yes. Labor rates, union agreements, and permitting requirements differ between Chicago, the collar counties, and downstate Illinois, so we price each estimate against the labor and material market for the project's actual location rather than a single statewide average. You can start from the home page to see the complete estimating lineup.