Electrical estimating in Arizona, built for contractors who bid to win.

Estimating Buddies puts bid-ready electrical takeoffs, material pricing and labor breakdowns in front of Arizona contractors in as little as 24 hours - priced against real Phoenix-metro and statewide labor and material rates, and checked against NEC and local jurisdiction requirements before it ever reaches your desk.

Electrical Riser

PHOENIX METRO · SHT E-01

Bid Ready
01

SVC ENT

Service entrance

02

MDP

Main distribution

03

FEEDER

Feeder run

04

PANEL A

225A / 42-circuit

Service, feeders and panels counted from the drawings - priced to Arizona material and labor rates.

24–48h

Standard turnaround

±2–5%

Typical estimate variance

15+

AZ counties covered

What We Offer

One estimating team, every electrical and MEP scope you bid.

Most Arizona contractors don't just need an electrical number - they need mechanical, plumbing and coordination pricing on the same timeline. We built our shop around that reality, so a single request covers whatever your bid package actually requires.

SHT-01

Electrical Estimating Services

Full electrical cost estimating for commercial, residential and industrial work across Arizona - service and distribution, branch circuits, devices, fixtures and gear, priced to bid-ready detail.

  • Rough-in and finish electrical
  • Panel and gear schedules
  • Site and parking lot lighting

SHT-02

Electrical Bid Estimating

Fast-turn pricing built specifically around bid-day deadlines - quantities, unit pricing and a clean summary sheet formatted the way your estimator needs it, not a generic export.

  • Bid-day rush turnaround
  • Addenda and revision tracking
  • Scope-gap flagging before submission

SHT-03

Mechanical Estimating Services

HVAC equipment, ductwork, piping and controls quantified alongside your electrical scope, so mechanical/electrical interfaces - power to units, controls wiring - don't fall through the cracks.

  • Ductwork and equipment takeoff
  • Piping and hydronic systems
  • Controls and BAS coordination

SHT-04

MEP Estimating Services

Combined mechanical, electrical and plumbing estimates for design-build and negotiated work, coordinated as one package so quantities and pricing logic line up across trades.

  • Cross-trade coordination review
  • Consolidated cost summary
  • Value-engineering options

SHT-05

Subcontractor Estimating Services

Detailed takeoffs built for electrical and mechanical subs bidding directly to GCs - organized to match how sub-tier bids get compared line by line at bid time.

  • Sub-tier bid formatting
  • Labor-hour breakdowns
  • Material vs. labor split

SHT-06

Contractor & GC Estimating Support

Ongoing estimating capacity for general contractors and design-build teams - a second set of hands during busy bid seasons, without adding a full-time estimator to payroll.

  • Overflow and multi-bid support
  • Budget and conceptual pricing
  • Construction cost estimate packages

Who We Serve

Built for the people who actually place the bid.

Arizona's construction market runs on a mix of large electrical contractors, small crews, and general contractors juggling multiple trades - our process flexes to fit each one.

Electrical Contractors

Licensed electrical contractors bidding commercial and residential projects who need a reliable second estimator during peak bid season, or want to bid more work without hiring in-house.

General Contractors

GCs who need electrical and mechanical numbers folded into a larger construction cost estimate, and want one point of contact instead of chasing multiple sub quotes on a deadline.

Subcontractors

Electrical and mechanical subs bidding directly to GCs, who need quantities and pricing formatted to stand up against competing sub-tier bids at the table.

Design-Build Teams

Design-build firms that need conceptual and detailed electrical/MEP pricing early enough in design to guide decisions, not just confirm them after drawings are final.

Developers & Owners

Owners and developers who want an independent budget check on electrical and mechanical scope before construction pricing comes back from bidding contractors.

Project Types

Commercial, residential and industrial - priced with the right context for each.

An estimate for a semiconductor build in Chandler doesn't price the same way as a tenant improvement in downtown Tucson. We adjust methodology, labor productivity and material sourcing to the project type in front of us.

Commercial

  • Office buildings
  • Retail centers
  • Restaurants
  • Hotels & hospitality
  • Medical & healthcare
  • Warehouse & distribution
  • K-12 & higher ed
  • Tenant improvements

Residential

  • Single-family homes
  • Custom & production builds
  • Multifamily & apartments
  • Townhome communities
  • Remodels & additions
  • Master-planned communities

Industrial & Institutional

  • Data centers
  • Semiconductor facilities
  • Manufacturing plants
  • Cold storage
  • Government & municipal
  • Solar & utility-scale

What's Included

What's actually in your estimate, and what you walk away with.

A takeoff is only useful if it's specific enough to price. Here's what's standard on every Arizona electrical estimate we return.

Included in every estimate

  • Full quantity takeoffDevices, fixtures, conduit, wire, panels and gear counted directly from your drawings.
  • Material pricingCurrent Arizona supplier and distributor pricing, not stale national averages.
  • Labor-hour breakdownProductivity rates adjusted for project type, site access and local labor conditions.
  • Scope clarification notesInclusions, exclusions and assumptions spelled out, so nothing gets misread at bid time.
  • Code compliance checkQuantities and design cross-checked against NEC and the adopted local code where the project sits.
  • RFI flaggingUnclear or conflicting drawing details called out before they become a bid-day surprise.

Deliverables you receive

  • Bid-ready Excel workbookEditable spreadsheet with quantities, unit costs, extended totals and a summary tab, formatted to drop straight into your bid process.
  • Marked-up drawing set (PDF)Color-coded takeoff markups so your team can trace every counted item back to its exact location on the plans.
  • Executive cost summaryOne-page rollup by system and cost category - material, labor, equipment and markup - for quick internal review.
  • Assumptions & exclusions logA written record of every assumption made during the estimate, protecting you if scope questions come up post-bid.

Sample Estimate

What a takeoff line item actually looks like.

A short excerpt from a commercial tenant-improvement electrical estimate in the Phoenix metro, showing how quantities and pricing are broken out by system.

Electrical Cost Estimate - Excerpt

PROJECT: RETAIL TI, GLENDALE AZ · SHT 04/12

Excel + PDF

26-05-19

THHN copper conductor, #12 AWG

4,820

LF

$0.42

$2,024.40

26-05-33

EMT conduit, 3/4"

1,340

LF

$3.15

$4,221.00

26-27-26

Duplex receptacle, spec-grade

86

EA

$34.50

$2,967.00

26-51-00

2x4 LED troffer, 4000K

64

EA

$118.00

$7,552.00

26-24-16

Panelboard, 225A, 42-circuit

2

EA

$2,940.00

$5,880.00

Subtotal, this excerpt

$22,644.40

Full estimates include labor hours by task, equipment rental, permit allowance, and a complete panel schedule. This excerpt is illustrative and not a live project quote.

How the Process Works

From drawing set to bid-ready number, in five steps.

Most contractors come to us against a deadline, so the process is built to move without cutting corners on accuracy.

01

Send us your drawings

Upload plans, specs and addenda through our intake form or email. Most Arizona projects come to us as PDF construction documents - full sets or partial bid packages both work.

02

Scope and timeline confirmed

We confirm project type, bid deadline and which systems you need priced, then give you a firm delivery window - usually within the hour for standard-size projects.

03

Takeoff and pricing

Our estimators complete the quantity takeoff, then apply current Arizona material and labor pricing, cross-checking against code requirements as they go.

04

Internal QA review

A second estimator reviews the completed take-off against the drawings before anything is sent - catching miscounts, missing scope or pricing errors ahead of delivery.

05

Delivery and revisions

You receive the Excel workbook, marked-up drawings and summary. If addenda land after delivery, we update the estimate at no charge before your bid closes.

Software & Pricing Sources

The tools and data behind every number.

We don't build estimates from memory or generic national averages. Every takeoff runs through the same digital tools and pricing sources contractors use to check our work.

Bluebeam Revu

Digital takeoff & markup

PlanSwift

Quantity takeoff

Trimble AccuBid

Electrical estimating

On-Screen Takeoff

Drawing measurement

Material pricing

Arizona electrical distributor pricing, refreshed on a rolling basis rather than a fixed annual catalog.

Labor rates

RSMeans construction cost data, adjusted for Phoenix-metro and statewide Arizona labor conditions.

Equipment pricing

Direct manufacturer and distributor quotes for gear, switchgear and specialty equipment.

Utility standards

Service entrance and metering requirements per APS, SRP and TEP, depending on project location.

Accuracy & Code Compliance

Checked against the code that actually applies to your address.

Arizona code isn't one-size-fits-all - Phoenix, Tucson, Maricopa County and smaller jurisdictions each adopt their own amendments on top of the base code. We check quantities against the version that applies to your specific project location.

Two-pass QA on every estimate

The estimator who builds the takeoff isn't the last person to review it. A second, independent estimator re-checks quantities, pricing and scope against the drawings before delivery.

Code cross-check, not just a count

Panel sizing, conductor ampacity, box fill, working clearances and grounding are checked against code minimums as part of the takeoff - not left for your field team to catch later.

Documented assumptions

Every judgment call - an unclear detail, a missing schedule, an ambiguous note - is written down, so you know exactly what the number does and doesn't include.

Revision tracking through addenda

When a project revises drawings mid-bid, we track what changed between sets and update only the affected quantities, rather than re-running the whole takeoff from scratch.

Why Contractors Choose Us

Why choose Estimating Buddies for Arizona electrical estimating.

Quantity takeoff and electrical estimating for Arizona contractors who need a number they can bid with - measured from the drawings, reviewed twice, and delivered before the deadline.

01

Arizona-specific pricing, not a national default

Material and labor rates are built around Phoenix-metro and statewide Arizona conditions - not a generic U.S. average that overstates or understates your real cost.

02

Estimators who read drawings, not just software

Every takeoff is built by an estimator with construction document experience, so ambiguous details get flagged instead of guessed at.

03

Turnaround that respects your bid deadline

Standard estimates deliver in 24–48 hours, with rush options available for bid-day-critical projects - we build our schedule around yours.

04

Transparent, itemized pricing

You see exactly how the number was built - quantities, unit pricing and labor hours - not a single lump sum with no way to check it.

05

No long-term contract required

Use us project by project, or as ongoing overflow capacity during your busiest bid seasons - there's no retainer or minimum commitment.

06

One team for electrical and mechanical

Need MEP pricing on the same job? The same team can scope mechanical alongside electrical, so your bid package stays coordinated.

Service Areas

Estimating support across Arizona, city by city.

We estimate projects statewide, with the deepest day-to-day experience in the Phoenix and Tucson metro markets.

PhoenixTucsonMesaChandlerScottsdaleGilbertTempeGlendalePeoriaSurpriseAvondaleBuckeyeYumaFlagstaffPrescott

Don't see your city listed? We regularly estimate projects across Maricopa, Pima, Pinal, Yavapai and Coconino counties, and take on work statewide - reach out with your project location and we'll confirm coverage before you send drawings.

Codes & Compliance

Quantities measured against the code that applies at your address

Arizona code isn't one-size-fits-all. We check quantities against the adopted NEC, local amendments and serving-utility standards for the specific city and county of the job.

AZ-01

NEC 2023 (as adopted by AZ jurisdictions)

Panel sizing, conductor ampacity, box fill, working clearances and grounding are checked against the NEC version adopted where the project sits.

AZ-02

IBC / IECC - local amendments

Building and energy-code amendments that affect lighting, power density and electrical scope are reviewed against the jurisdiction of record.

AZ-03

Phoenix & Maricopa County amendments

Phoenix-metro projects are checked against city and county amendments on top of the base code, not a statewide default.

AZ-04

Tucson / Pima County amendments

Southern Arizona work is priced and quantified against Tucson and Pima County adoption, including local electrical amendments.

AZ-05

APS / SRP / TEP service standards

Service entrance, metering and utility coordination follow the serving utility - APS, SRP or TEP - depending on project location.

AZ-06

ADA & accessibility clearance requirements

Device mounting, panel working space and public-facing electrical work are reviewed against accessibility clearance requirements.

Cost & Pricing

What determines the cost of your estimate.

Estimating fees are quoted per project, based on a few concrete factors - not a flat rate that ignores project complexity.

01

Project size

Square footage and system complexity are the biggest driver - a small tenant improvement prices differently than a multi-building industrial campus.

02

Drawing completeness

Fully detailed construction documents take less interpretation than early-stage or design-development drawings, which affects estimating time.

03

Turnaround requested

Standard 24–48 hour delivery is priced differently than a same-day rush requested against a tight bid deadline.

04

Scope requested

Electrical alone is priced separately from combined electrical and mechanical (MEP) scope, since MEP requires coordinating multiple systems.

05

Project type

Industrial and specialty work - data centers, semiconductor facilities, medical buildings - carries more systems to quantify than standard commercial or residential work.

Every quote is free and based on your actual drawing set - send your plans and we'll confirm a firm price and delivery time before any work begins.

Get a Free Quote

Ready to Bid?

Get a free electrical estimate

Send your plans and we'll return a firm, no-obligation quote before any work begins - there's no cost to find out what your Arizona project would run.

  • 24–48 hour turnaround on most projects
  • Bid-ready Excel workbook with drawing markups
  • Arizona material and labor pricing, not national averages
  • Addenda updates at no charge before bid close

Frequently asked questions

Common questions from Arizona contractors.

A complete quantity takeoff of devices, fixtures, conduit, wire, panels and gear, priced with current Arizona material and labor rates, plus a written log of assumptions and exclusions so you know exactly what the number covers.

Most standard commercial and residential projects deliver within 24–48 hours. Larger or industrial projects may take longer, and rush turnaround is available for bid-day deadlines - we confirm a firm delivery window before starting.