EstimatingBuddies provides electrical estimating services in California for contractors bidding commercial, residential, industrial, and public works projects — full quantity takeoff, material takeoff, and priced electrical cost estimates, delivered against Title 24, CALGreen, and DIR prevailing wage requirements where they apply.

One-line reference

SERVICE TO BRANCH CIRCUITS

rev. CA
01

UTILITY

Utility source

02

MAIN SVC

Main service

03

PNL A

Panel A

04

PNL B

Panel B

05

LTG

Lighting

06

RCPT

Receptacles

07

LOW-V

Low voltage

08

EV

EV charging

09

CA

rev. CA

One-line reference — service to branch circuits.

Statewide California

Service area

Commercial, residential, industrial, public

Project types

PDF, CAD, Revit export

Formats accepted

Why EstimatingBuddies

A number your project manager can actually use.

Most electrical estimating companies price a set of drawings and hand back a number. We build the number the way your project manager will actually use it — broken out by system and by CSI division, with quantities you can check against the drawings and pricing you can defend at buyout.

Broken out by system and CSI division

The number is built the way your project manager will actually use it — separated by system and by CSI division, not handed back as a single lump sum.

Quantities you can check against the drawings

Takeoff quantities stay visible, so your team can trace counts back to the electrical set before the number goes into a bid.

Pricing you can defend at buyout

Labor and material are priced so the estimate holds up in a buyout meeting, not just on the day the drawings were counted.

Built for how California contractors bid

Whether you are bidding a tenant improvement in Los Angeles, a school under DSA review in the Central Valley, or a prevailing-wage public works job in the Bay Area, the takeoff follows how California electrical contractors actually estimate.

01 - Services

Electrical estimating services, by scope.

Order a full estimate or a single service - quantity takeoff, pricing, or bid packaging - depending on where you are in the buyout process.

01

Electrical cost estimating California

Labor and material pricing for the full electrical scope, sourced against current supplier and labor rates for your market.

02

Quantity & material takeoff California

Conductor, conduit, device, and fixture counts taken directly off drawings - the raw quantities your buyout is built on.

03

Electrical bid estimating California

A priced, formatted estimate ready to drop into a bid, including scope clarifications and exclusions for your proposal.

04

Conceptual & budget estimating California

Early, drawing-light pricing for pre-construction and design development, so budgets hold as the design firms up.

05

Change order estimating California

Delta pricing against approved scope, formatted to match how your GC or owner reviews and approves change orders.

06

MEP-coordinated estimating California

Electrical scope cross-checked against mechanical and plumbing takeoffs on the same set, to catch shared-space conflicts early.

02 — Systems

Every system on the one-line, priced separately.

Line-voltage and low-voltage scope are quantified as distinct trades, so you can self-perform, subcontract, or bid each one on its own.

PWR-01

Power distribution & service equipment

Switchboards, panelboards, transformers, feeders, and service entrance sizing.

Panel takeoffFeeder schedule

LTG-02

Lighting & lighting controls

Fixture counts, circuiting, and controls priced against Title 24 lighting power density limits.

Fixture takeoffTitle 24

WIR-03

Wiring, conduit & raceway

Conductor and raceway quantities by type — EMT, PVC, rigid, cable tray — with grounding and bonding included.

Conduit takeoffCable tray

LOV-04

Low voltage systems

Fire alarm, security and access control, CCTV, and structured cabling scoped and priced independently.

Fire alarmStructured cabling

EVC-05

EV charging infrastructure

Charger counts, dedicated circuits, and make-ready conduit for commercial and residential EV charging scope.

EV-readyMake-ready

SOL-06

Solar-ready & PV electrical scope

Interconnection, conduit runs, and panel provisions for solar-ready and photovoltaic-integrated projects.

PV takeoffInterconnection

03 — Project types

Built for the projects California contractors actually bid.

Commercial, residential, industrial, and public work — each estimated around the systems and bid conditions that show up on that type of California job.

Commercial

  • Office & tenant improvement
  • Retail & restaurant
  • Hotel & hospitality
  • Data center

Residential

  • Single-family, new construction
  • Multifamily & apartment
  • Condo & townhouse
  • Renovation & ADU

Industrial

  • Warehouse & distribution
  • Manufacturing & plant
  • Cold storage
  • Power & process

Institutional & public

  • K-12 & DSA-reviewed schools
  • Hospital & healthcare
  • Municipal & state projects
  • Prevailing wage public works

04 — California-specific

Estimates that already account for California requirements.

Four things that change an electrical bid in California and don't show up on a generic national takeoff.

Energy code

Title 24, Part 6

Lighting power density, mandatory lighting controls, and demand response provisions are checked against the scope during takeoff, not left for a plan check comment.

Green building

CALGreen

EV-charging readiness and solar-ready electrical rough-in required under CALGreen are quantified as their own line items on applicable projects.

Labor

DIR prevailing wage

Public works and school estimates are priced against current DIR prevailing wage determinations, formatted to match your certified payroll process.

Public projects

DSA & public works

Estimates for DSA-reviewed school and public agency work are structured to match the bid documentation those approval processes require.

05 — Process

From drawing set to priced estimate.

Six steps from the electrical set you send to a priced estimate your buyout process can use.

01

Share your drawings

Send the electrical set — PDF, CAD, or Revit export — along with any addenda or spec sections that affect scope.

02

Scope confirmation

We confirm systems in scope, bid date, deliverable format, and any California-specific requirements before takeoff starts.

03

Takeoff & pricing

Quantities are taken off by system, then priced against current labor and material rates for your county.

04

Internal QA review

A second estimator checks quantities against the drawings and flags any assumptions before delivery.

05

Delivery

You receive the priced estimate, takeoff detail, and scope summary in the format your buyout process uses.

06

Revisions & bid-day support

Addenda pricing and clarifications are turned around fast enough to still make the bid deadline.

06 — Sample output

What a line-item estimate looks like.

An excerpt from a commercial tenant-improvement electrical estimate, panel and branch circuit scope.

Sample excerpt — commercial TI, Southern California

PANEL AND BRANCH CIRCUIT SCOPE

Excel

Panelboard

225A, 42-circuit, surface mount

2

EA

$1,840

$3,680

Feeder conductor

3/0 THHN copper, in EMT

380

LF

$14.20

$5,396

LED troffer

2x4, Title 24-compliant, w/ controls

96

EA

$132

$12,672

Lighting control

Occupancy & daylight harvesting zones

14

ZONE

$310

$4,340

Duplex receptacle

20A, incl. device & plate

142

EA

$58

$8,236

EV make-ready conduit

1" conduit stub to future charger locations

6

EA

$410

$2,460

Subtotal, excerpt shown

$36,784

07 — Tools & data

Estimated in the software your team already reviews.

Takeoff runs in Bluebeam and PlanSwift from PDF, CAD, and Revit exports. Pricing can be delivered in Accubid, ConEst, or a formatted Excel workbook.

Bluebeam Revu

Digital takeoff & markup

PlanSwift

Quantity takeoff

Accubid

Electrical estimating

ConEst

Electrical estimating

Trimble

Takeoff & estimating

RSMeans cost data

Cost data

Current supplier quotes

Material pricing

Formatted Excel workbook

Buyout deliverable

08 — Service areas

Electrical estimating services across California.

Statewide coverage, with the highest volume of work in these regions.

Southern California

  • Los Angeles
  • Long Beach
  • Irvine
  • San Diego
  • Bakersfield

Bay Area

  • San Francisco
  • San Jose
  • Oakland

Central Valley & Capital

  • Sacramento
  • Fresno

Accuracy & review

Checked before it reaches your bid.

Quantities, California code items, and assumptions are reviewed before the priced estimate is delivered.

A second estimator checks the takeoff

Before delivery, a second estimator checks quantities against the drawings and flags any assumptions.

California requirements checked during takeoff

Title 24 lighting power density and controls, CALGreen EV-ready and solar-ready rough-in, and DIR prevailing wage are accounted for where they apply.

Incomplete drawings are still usable

DD-level and design-build packages are estimated with assumptions and allowances noted, so the number can be used for budgeting before drawings are complete.

Project information stays confidential

Drawings and pricing are handled under confidentiality by default, and an NDA is signed before review if your company requires one.

Why contractors use this estimate

Built around how California electrical contractors bid.

A tenant improvement in Los Angeles, a DSA school in the Central Valley, and a prevailing-wage public works job in the Bay Area are estimated around the requirements those bids actually carry.

01

California code in the number

Title 24, CALGreen, and DIR prevailing wage are built into the estimate where they apply, instead of left for a later plan check.

02

Priced by system, not as one lump sum

Power, lighting, low voltage, EV, and solar-ready scope are quantified separately so you can self-perform, subcontract, or bid each one.

03

County labor and material rates

Takeoff quantities are priced against current labor and material rates for your county, including DIR rates on public works.

04

Formatted for your buyout

You receive the priced estimate, takeoff detail, and scope summary in Accubid, ConEst, or a formatted Excel workbook.

05

Addenda without a full re-estimate

Addenda and scope changes after the first delivery are priced as incremental updates, turned around in time for the bid deadline.

06

One service or the full estimate

Order quantity takeoff, pricing, or bid packaging on its own, or the full electrical estimate, depending on where you are in buyout.

09 — Pricing factors

What changes the cost of an estimate.

Estimating time follows the drawing set, the systems in scope, and the turnaround you need.

01

Project size & scope

Square footage and number of systems in scope drive takeoff time more than project type.

02

Drawing completeness

DD-level sets take longer to estimate than a fully coordinated construction document set.

03

System complexity

Low voltage, EV infrastructure, and solar-ready scope add takeoff time beyond standard power and lighting.

04

Turnaround requested

Standard turnaround is 2–4 business days; rush requests are accommodated where capacity allows.

05

Prevailing wage requirement

DIR-rate public works pricing requires additional labor rate research and formatting.

06

Revision rounds

Addenda and scope changes after initial delivery are priced as incremental updates, not a full re-estimate.

Request a sample estimate

Send your California electrical set

Share the drawings, bid date, and whether Title 24, CALGreen, or DIR prevailing wage applies. We'll confirm scope and turnaround before takeoff starts.

  • Quantity and material takeoff broken out by system
  • Priced against Title 24, CALGreen, and DIR where they apply
  • Standard turnaround of 2–4 business days
  • Delivered in Accubid, ConEst, or a formatted Excel workbook

10 — FAQ

Questions we hear from California contractors

A full quantity and material takeoff broken out by system — power distribution, lighting, low voltage, and wiring/conduit — priced with labor and material, plus a scope summary you can hand straight to a bid or a buyout meeting. You can start from the home page to see the complete estimating lineup.

Most single-building commercial or residential estimates are returned in 2 to 4 business days. Larger or multi-phase public works projects typically run 5 to 8 business days depending on drawing volume. When that trade is on the plans, our roofing estimating services can price it with the same set.