Electrical estimating services in Illinois, sized for how Chicagoland bids work.

Estimating Buddies builds bid-ready electrical and MEP takeoffs for Illinois contractors - quantities, Illinois-specific labor and material pricing, and scope checked against code, from Loop high-rises to Rockford industrial builds.

Electrical Riser

CHICAGOLAND · SHT E-01

Bid Ready
01

SVC ENT

Service entrance

02

MDP

Main distribution

03

FEEDER

Feeder run

04

PANEL A

225A / 42-circuit

Service, feeders and panels counted from the drawings - priced to Illinois material and labor rates.

24–48H

Turnaround

Statewide

IL coverage

±2–5%

Typical variance

2-Pass

QA review

What We Offer

One directory of estimating services for every trade on your bid.

Illinois contractors rarely bid electrical in isolation - mechanical, coordination and full MEP packages usually share the same deadline. Our team covers all of it under one request.

01 · CORE SCOPE

Electrical Estimating Services

Full electrical cost estimating for Illinois projects - service and distribution, branch wiring, devices, fixtures and gear, quantified to a bid-ready level of detail.

  • Rough-in & finish
  • Panel schedules
  • Site lighting

02 · BID SUPPORT

Electrical Bid Estimating

Turnaround built around your bid clock - clean quantities, unit pricing and a summary sheet ready for submission, with addenda tracked as they're issued.

  • Rush turnaround
  • Addenda tracking

03 · MECHANICAL

Mechanical Estimating Services

HVAC, ductwork, piping and controls quantified alongside electrical scope, catching power and controls interfaces before they reach the field.

  • Ductwork takeoff
  • Controls coordination

04 · COMBINED

MEP Estimating Services

Mechanical, electrical and plumbing priced as one coordinated package - built for design-build and negotiated work where trade interfaces need to align.

  • Cross-trade review
  • One cost summary

05 · SUB-TIER

Subcontractor Estimating Services

Detailed takeoffs for electrical and mechanical subs bidding to GCs, formatted the way sub bids get compared line by line at bid time.

  • Labor-hour splits
  • Material vs. labor

06 · GC SUPPORT

Contractor Estimating Services

Overflow estimating capacity for GCs and design-build teams during heavy bid seasons, including full construction cost estimate packages when you need the whole picture.

  • Overflow capacity
  • Budget pricing

Who We Serve

From the Loop to downstate Illinois.

From large Chicago electrical contractors to small crews in Central and Southern Illinois, the process adapts to how you actually bid work.

01

Electrical Contractors

Licensed IL electrical contractors needing a reliable second estimator during peak bid season without adding headcount.

02

General Contractors

GCs folding electrical and mechanical numbers into a larger construction cost estimate, with one point of contact.

03

Subcontractors

Electrical and mechanical subs bidding directly to GCs, needing numbers formatted to hold up at the bid table.

04

Design-Build Teams

Firms needing conceptual and detailed pricing early enough in design to actually shape decisions.

05

Developers & Owners

Owners wanting an independent budget check on electrical and mechanical scope before bids return.

06

Public Works Teams

Contractors bidding municipal and public works electrical projects requiring documented, defensible pricing.

Project Types

Commercial, residential and industrial - priced by zone.

A Cook County high-rise doesn't price the same way as a Peoria warehouse. Methodology and labor productivity shift with the project type.

Commercial Zone

  • Office & retail
  • Hospitality & restaurants
  • Healthcare facilities
  • Tenant improvements
  • High-rise & mixed-use

Residential Zone

  • Single-family & custom homes
  • Multifamily & apartments
  • Condominium & townhouse
  • Remodels & additions
  • Affordable housing

Industrial Zone

  • Data centers
  • Manufacturing & plants
  • Logistics & distribution
  • Food processing & cold storage
  • Public works & government

What's Included

What's in the estimate, and what lands in your inbox.

A takeoff is only useful if it's specific enough to price. Here's what's standard on every Illinois electrical estimate we return.

Included in every estimate

  • Full quantity takeoffDevices, fixtures, conduit, wire, panels and gear counted directly from your drawings.
  • Illinois material pricingCurrent Chicagoland and statewide distributor pricing, not a national flat average.
  • Labor-hour breakdownProductivity adjusted for project type, site access and local Illinois labor conditions.
  • Scope notesInclusions, exclusions and assumptions written out clearly.
  • Code compliance checkQuantities cross-checked against NEC and the jurisdiction's adopted local amendments.
  • RFI flaggingUnclear or conflicting drawing details called out before bid day.

Deliverables

  • DOCBid-ready Excel workbookEditable quantities, unit costs, extended totals and a summary tab.
  • PDFMarked-up drawing setColor-coded takeoff markups tracing every item to its location on the plans.
  • SUMExecutive cost summaryOne-page rollup by system and cost category for a fast internal review.
  • LOGAssumptions & exclusions logA written record of every judgment call made during the takeoff.

Sample Estimate

A line-item excerpt, priced.

Pulled from a commercial electrical estimate for a Naperville office build-out.

Electrical Estimate - Excerpt

PROJECT: OFFICE TI, NAPERVILLE IL

Excel + PDF

26-05-19

THHN copper, #12 AWG

4,110

LF

$0.41

$1,685.10

26-05-33

EMT conduit, 3/4"

1,205

LF

$3.10

$3,735.50

26-27-26

Duplex receptacle, spec-grade

78

EA

$33.75

$2,632.50

26-51-00

2x4 LED troffer, 4000K

58

EA

$116.00

$6,728.00

26-24-16

Panelboard, 225A, 42-circuit

2

EA

$2,910.00

$5,820.00

Subtotal, this excerpt

$20,601.10

Full estimates include labor hours by task, equipment, permit allowance and complete panel schedules. Illustrative excerpt, not a live quote.

How the Process Works

Drawings in, bid-ready number out - five stops.

Most contractors come to us against a deadline, so the process is built to move without cutting corners on accuracy.

STOP 01

Send your drawings

Upload plans, specs and addenda through our intake form or email.

STOP 02

Scope confirmed

We confirm project type, deadline and which systems need pricing.

STOP 03

Takeoff & pricing

Estimators build the quantity takeoff with current Illinois rates.

STOP 04

QA review

A second estimator checks the takeoff against the drawings.

STOP 05

Delivery

You receive the workbook, markups and summary - free addenda updates included.

Software & Pricing Sources

The tools and data behind every figure.

No stale national averages - every takeoff runs through the same tools and pricing sources contractors use to check our numbers.

Bluebeam Revu

Digital takeoff & markup

PlanSwift

Quantity takeoff

Trimble AccuBid

Electrical estimating

On-Screen Takeoff

Drawing measurement

RSMeans

Labor & cost data

Material pricing

Chicagoland and statewide Illinois distributor pricing, refreshed on a rolling basis.

Labor rates

RSMeans cost data adjusted for Cook, DuPage, Will, Lake and Kane County labor conditions.

Equipment pricing

Direct manufacturer and distributor quotes for gear, switchgear and specialty equipment.

Utility standards

Service and metering requirements per ComEd and Ameren, depending on project location.

Accuracy & Code Compliance

Checked against the code your jurisdiction enforces.

Chicago, Cook County and smaller Illinois jurisdictions each layer local amendments on the base code. We check against the version that applies to your project's address.

QA Pass 1

The estimator who builds the takeoff completes a full self-check of quantities against the drawing set.

QA Pass 2

A second, independent estimator re-checks quantities, pricing and scope before anything is delivered.

Code Cross-Check

Panel sizing, conductor ampacity, box fill, clearances and grounding are checked against code minimums as part of the takeoff itself.

Documented Assumptions

Every judgment call on an unclear detail or missing schedule is written down, so you know exactly what the number covers.

Revision Tracking

When drawings revise mid-bid, we track what changed and update only the affected quantities.

Why Contractors Choose Us

Why choose Estimating Buddies for electrical estimating in Illinois.

Quantity takeoff and electrical estimating for Illinois contractors who need a number they can bid with - measured from the drawings, reviewed twice, and delivered before the deadline.

IL-FIRST

Illinois-specific pricing

Pricing built around Chicagoland and statewide Illinois conditions, not a generic national default.

24–48H

Deadline-aware turnaround

Deadline-aware turnaround, with rush options when a bid deadline is tight.

2-PASS QA

Second-estimator review

Every estimate is checked by a second estimator before it reaches you.

OPEN BOOK

Full visibility

Full visibility into quantities, unit pricing and labor hours - never a single lump sum.

NO LOCK-IN

No retainer required

No retainer or minimum commitment - use us for one bid or as ongoing overflow capacity.

ONE TEAM

Coordinated MEP scope

The same team scopes MEP alongside electrical, so your bid package stays coordinated.

Service Areas

Coverage across Illinois, region by region.

Deepest day-to-day experience is in Chicagoland, with regular work statewide.

Chicagoland

Chicago, Aurora, Naperville, Joliet, Elgin, Schaumburg, Evanston, Cicero, Waukegan, Bolingbrook, Arlington Heights, Orland Park

Northern IL

Rockford, Des Plaines, Palatine, Skokie, Downers Grove, Tinley Park, Oak Park, Oak Lawn

Central IL

Springfield, Peoria, Bloomington, Decatur, Champaign

Counties

Cook, DuPage, Lake, Will, Kane and surrounding counties statewide

Don't see your city? We regularly cover projects statewide - send your project location and we'll confirm coverage before you upload drawings.

Codes & Compliance

Quantities measured against the code that applies at your address

Illinois code isn't one-size-fits-all. We check quantities against the adopted NEC, local amendments and serving-utility standards for the specific city and county of the job.

IL-01

NEC 2023 (IL-adopted)

Panel sizing, conductor ampacity, box fill, clearances and grounding are checked against the Illinois-adopted NEC version for the project address.

IL-02

Illinois State Plumbing & Building Codes

Statewide plumbing and building-code requirements that affect electrical interfaces, coordination and MEP packages are reviewed with the takeoff.

IL-03

City of Chicago Electrical Code

Chicago projects are checked against the City of Chicago Electrical Code, not a statewide default.

IL-04

Cook County amendments

Cook County work is reviewed against county amendments layered on top of the base code.

IL-05

ComEd / Ameren service standards

Service entrance, metering and utility coordination follow ComEd or Ameren, depending on project location.

IL-06

ADA & accessibility clearances

Device mounting, panel working space and public-facing electrical work are reviewed against accessibility clearance requirements.

Cost & Pricing

What sets the price of your estimate.

Estimating fees are quoted per project against a few concrete factors - never a flat rate that ignores complexity.

01

Project size

Square footage and system complexity are the largest driver of estimating time.

02

Drawing completeness

Fully detailed construction documents take less interpretation than early design-development sets.

03

Turnaround requested

Standard 24–48 hour delivery is priced differently than a same-day rush against a tight deadline.

04

Scope requested

Electrical alone is priced separately from combined electrical and mechanical (MEP) scope.

05

Project type

Industrial and specialty work - data centers, manufacturing, healthcare - carries more systems to quantify.

Every quote is free and based on your actual drawing set - send your plans and we'll confirm a firm price and delivery time before work begins.

Get a Free Quote

Ready to Bid?

Get a free electrical estimate

Send your plans and we'll return a firm, no-obligation quote before any work begins - there's no cost to find out what your Illinois project would run.

  • 24–48 hour turnaround on most projects
  • Bid-ready Excel workbook with drawing markups
  • Illinois material and labor pricing, not national averages
  • Addenda updates at no charge before bid close

Frequently asked questions

Common questions from Illinois contractors.

A full quantity takeoff of devices, fixtures, conduit, wire, panels and gear, priced with current Illinois material and labor rates, plus a written log of assumptions and exclusions.

Most standard projects deliver in 24–48 hours. Larger or industrial projects may take longer, and rush turnaround is available for tight bid deadlines.