Construction estimates measured for Georgia's bid calendar, not a national average

Estimating Buddies is a construction estimating company that turns your drawings into a bid-ready quantity takeoff and construction cost estimate - whether you're bidding a warehouse near Savannah, a mixed-use tower in Midtown Atlanta, or a custom home outside Athens.

Takeoff Snapshot

PROJECT #GA-SAV

Bid Ready

Project type

Warehouse / logistics

Location

Savannah, GA

Concrete

642 CY

Structural steel

88.2 Tons

TPO roofing

96,000 SF

Electrical

8,760 LF

Delivered as a formula-linked Excel workbook with PDF markups tied to every line.

24–48h

Typical turnaround time

159

Georgia counties covered

20+

CSI divisions estimated

2nd

Independent review, every job

On this page

What We Offer

A construction estimating company built around your trade, not a one-size template

Some contractors need a quick material count before a bid closes today; others need a full construction cost estimate ready for owner review next week. Our services are structured to cover both ends of that range.

Serves: general contractors, subcontractors, developers

Quantity Takeoff Services Georgia

Line-by-line construction quantity takeoff covering concrete, framing, masonry, roofing, drywall, and finishes, sorted by CSI division so your subcontractors can price without guesswork.

Serves: home builders, framing crews, suppliers

Material Takeoff Services Georgia

A purchasable material list with quantities, units, and waste allowances built in - the kind of takeoff your purchasing team can hand straight to a supplier for a quote.

Serves: GCs, owners, project managers

Construction Cost Estimating Georgia

Current material pricing and regional labor productivity applied on top of your takeoff, producing a full construction cost estimate you can defend to an owner or lender.

Serves: contractor estimating teams under deadline

Construction Bid Estimating Georgia

Rapid-turnaround bid support, including addendum updates as they come in, so the number you submit reflects the drawings that are actually current.

Serves: MEP subcontractors, design-build teams

MEP Estimating Services Georgia

Mechanical, electrical, and plumbing takeoffs - ductwork, conduit, cable tray, piping, and fixtures - separated by system for clean subcontractor estimating services.

Serves: concrete and steel subcontractors

Structural & Concrete Takeoff Georgia

Rebar, formwork, cast-in-place and precast concrete, and structural steel tonnage, checked against structural drawings and connection schedules.

Who We Serve

Georgia's builders, from a single lot to a full logistics park

Whether you're a solo estimator wearing five hats or a preconstruction team running several bids in parallel, we plug in wherever the work needs a second set of hands.

General Contractors

Complete construction quantity takeoff across every trade, giving you one consistent number instead of stitched-together estimates from past jobs.

Subcontractors

Single-trade takeoffs sized to exactly the scope you're bidding - no need to sort through quantities that belong to someone else's package.

Home Builders

Repeatable material takeoffs for production plans and one-off custom homes alike, from Cobb County to coastal Chatham County.

Developers

Early quantity checks at the concept and schematic stage, so a project budget is grounded in real numbers before drawings are locked.

Architects & Engineers

Independent cost verification during design development, useful when a client wants a reality check before construction documents.

Owners & Suppliers

Procurement-ready quantity lists for material forecasting, or an independent check against a contractor's submitted numbers.

Project Types

From a Peachtree City remodel to a Savannah distribution center

Georgia's construction pipeline spans single-family subdivisions, hyperscale data centers, and some of the country's busiest film production facilities. We size our approach to what the project actually needs.

Residential construction estimating

Single-family homes, custom builds, additions, and townhome communities across metro Atlanta and beyond.

Atlanta, Alpharetta

Commercial construction estimating

Office build-outs, retail centers, restaurants, and hospitality projects, including full tenant improvement scopes.

Metro Atlanta corridor

Multifamily & mixed-use

Apartment communities, condominiums, and mixed-use developments with ground-floor retail.

I-75 / I-16 corridor

Industrial & manufacturing

EV and battery manufacturing plants, food processing facilities, and general industrial construction.

Savannah, Port of Savannah

Warehouse & logistics

Distribution centers, fulfillment warehouses, and cold storage facilities tied to Georgia's port-driven freight growth.

Douglas County, Fulton County

Data centers

Structural, electrical, and mechanical takeoffs for mission-critical, hyperscale data center construction.

Fayetteville, Atlanta, Savannah

Film & entertainment facilities

Soundstage and studio complex takeoffs - structural, electrical, and HVAC scope for production facilities.

Statewide

Healthcare projects

Hospitals, medical offices, clinics, and senior living facilities with detailed MEP takeoff requirements.

Statewide

Civil & site work

Grading, earthwork, utilities, paving, and roadway scope tied to public infrastructure work.

Statewide, GDOT projects

What's Included

Every estimate is built to be usable, not just accurate

A takeoff that only you can interpret isn't finished. Here's the standard we hold every deliverable to, no matter the trade or the size of the job.

01

Quantities itemized by CSI MasterFormat division

02

Units matched to how suppliers quote - SF, LF, CY, tons, EA

03

Material-specific waste and overage allowances

04

Trade-by-trade breakdowns for clean subcontractor scoping

05

Color-coded, marked-up drawings tied to each quantity line

06

Written notes on assumptions, exclusions, and drawing gaps

07

Addendum tracking when plans revise mid-bid

08

A spreadsheet formatted to drop into your existing bid template

Deliverables

What a completed takeoff actually looks like

Here's a shortened division summary from a real deliverable format, based on a warehouse project outside Savannah, GA.

Deliverable Preview - Division Summary

estimatingbuddies.com

Excel + PDF

03 - Concrete

Slab-on-grade, tilt-wall panels, dock foundations

642

CY

05 - Metals

Structural steel framing, roof joists, deck

88.2

Tons

07 - Thermal & Moisture

TPO roofing membrane and insulation

96,000

SF

09 - Finishes

Office area drywall, paint, ceiling grid

4,300

SF

21 - Fire Protection

Sprinkler piping, ESFR heads

11,200

LF

26 - Electrical

Conduit, cable tray, high-bay lighting

8,760

LF

Deliverables ship as a formula-linked Excel workbook plus PDF markups keyed to every line item, so anyone reviewing the bid can trace a number back to the drawing it came from.

How the Process Works

Five steps between your plan set and a number you can bid

Most contractors come to us against a deadline, so the process is built to move without cutting corners on accuracy.

01

Upload your drawings

Send PDF plans, CAD files, or a full bid package along with the trades you need covered and your bid due date.

02

We confirm scope

Our team reviews the set for completeness and flags missing sheets, unclear specs, or contradictions before any counting starts.

03

Measurement & internal check

An estimator takes off quantities using on-screen takeoff software, then a second estimator independently verifies every line.

04

Delivery to your inbox

You receive the completed takeoff or estimate - typically within 24 to 48 hours, sooner for smaller or simpler scopes.

05

Addenda handled as they land

If revised drawings arrive before the bid closes, we update only the affected quantities so nothing slows down your submission.

Software & Pricing Sources

Digital takeoffs, measured the way your own estimators would

Quantities are measured directly from your PDF or CAD drawings using the same on-screen takeoff platforms most Georgia estimating departments already run.

PlanSwiftBluebeam RevuOn-Screen TakeoffTrimble

Regional material pricing

Costs are sourced from recent supplier data for the Georgia market rather than stale national price books.

Local labor productivity

Labor hours reflect typical Georgia crew output, adjusted for project type, site access, and schedule.

Your own cost history

If you provide preferred unit costs or supplier quotes, we build the estimate around those figures instead of a generic average.

Accuracy & Quality Control

A missed quantity costs more than the takeoff itself

An underestimated scope can eat straight into your margin after the contract is signed, and an overstated one can cost you the bid entirely. Review isn't a final polish step here - it's built into the workflow.

01

Second-estimator review

Every job is independently checked against the original drawings before it's sent back to you.

02

Traceable line items

Each quantity links back to a marked, color-coded location on the plans so you can verify it yourself.

03

Scope gaps flagged in writing

Unclear or conflicting details are noted explicitly rather than resolved with a silent assumption.

04

Corrections before your bid closes

If something looks off once you review it, we walk through it with you and fix it at no charge.

Why Choose Us

What contractors actually get from working with us

Quantity takeoff and construction estimating for Georgia contractors who need a number they can bid with - measured from the drawings, reviewed twice, and delivered before the deadline.

Georgia market knowledge

From Port of Savannah logistics work to Atlanta high-rise construction, we understand what's actually being built in this state.

Real estimators on every job

Quantities are measured by people who read drawings professionally, not run through an automated template.

Turnaround built for bid day

24-48 hour standard delivery, with rush handling available when your deadline is tighter than that.

Nothing hidden in the number

You see exactly what was measured and where - every line traces back to the drawing it came from.

Service Area

Quantity takeoff services across Georgia, USA

All work is done digitally from your drawings, so location is never a limiting factor - we take on projects statewide, not just around Atlanta.

Metro Atlanta

AtlantaAlpharettaMariettaRoswellSandy SpringsDuluthLawrencevilleWoodstockPeachtree City

Statewide Georgia

SavannahAugustaColumbusMaconAthensWarner RobinsValdostaBrunswickStatesboro

Counties we regularly serve

Fulton CountyCobb CountyGwinnett CountyDeKalb CountyClayton CountyForsyth CountyCherokee CountyChatham County (Savannah)Richmond County (Augusta)

Codes & Compliance

Quantities checked against Georgia's own code framework

Footing depths, fire-rated assemblies, wind bracing, and stormwater scope are all driven by code requirements - we factor that in rather than measuring every drawing set the same way regardless of jurisdiction.

GA-MIN

Georgia State Minimum Standard Codes

Structural, fire protection, and life-safety quantities are checked against the current codes adopted statewide in Georgia.

GA-IRC

International Residential Code (Georgia amendments)

Single-family and townhome takeoffs reflect the framing, footing, and insulation requirements under Georgia's residential code adoption.

GDOT

GDOT standards

Roadway, paving, and utility quantities for public infrastructure work are aligned with GDOT specifications and standard drawings.

WIND

Coastal and wind provisions

Projects around Savannah and the Georgia coast are reviewed for wind-resistant detailing appropriate to that zone.

STORM

Local stormwater ordinances

Earthwork and site utility quantities account for county-level stormwater and grading requirements that affect scope.

CSI

CSI MasterFormat alignment

Every takeoff is organized by CSI division, mapping cleanly onto code-driven specification sections and trade scopes.

Cost & Pricing

What actually shapes the price of your estimate

There's no flat rate that fits every job - a single-trade residential material takeoff and a multi-division industrial estimate take very different amounts of work. Here's what drives the quote.

01

Project size and scope

Square footage, sheet count, and number of trades involved are the largest factors in cost.

02

Number of divisions requested

A single-trade takeoff costs less than a full multi-division construction quantity takeoff.

03

Turnaround requested

Standard 24-48 hour delivery is priced differently than a same-day or rush request against a closing bid.

04

Drawing quality

Complete, fully dimensioned sets take less time to measure than incomplete or low-resolution scans.

05

Level of detail needed

A high-level budget check costs less than a fully itemized, bid-ready takeoff with waste factors applied.

06

Pricing layer requested

Adding a full construction cost estimator's pricing on top of quantities costs more than quantities alone.

Send your plans and you'll get a firm, no-obligation quote before any work starts - there's no cost to find out.

Ready to Bid?

Request a free sample takeoff

Send your plans and we'll return a firm, no-obligation quote before any work begins - there's no cost to find out what your Georgia project would run.

  • 24–48 hour turnaround on most projects
  • CSI-sorted Excel workbook with drawing markups
  • Works from PDF, CAD, or a full bid set
  • Addenda updates before the bid closes

Frequently asked questions

Questions Georgia contractors ask us most

Every construction quantity takeoff includes quantities itemized by CSI MasterFormat division, units matched to how suppliers quote (SF, LF, CY, tons, EA), material-specific waste and overage allowances, trade-by-trade breakdowns, color-coded marked-up drawings tied to each quantity line, written notes on assumptions and exclusions, addendum tracking when plans revise, and a spreadsheet formatted to drop into your existing bid template.

There is no single flat rate. Cost depends on project size and scope, the number of CSI divisions requested, turnaround, drawing quality, the level of detail needed, and whether a full pricing layer is added on top of quantities. Send your plans and you'll get a firm, no-obligation quote before any work starts.